filling core
英 [ˈfɪlɪŋ kɔː(r)]
美 [ˈfɪlɪŋ kɔːr]
网络 椿入蕊; 埋入砂心
双语例句
- Then whether the filling core method is fit is known, and the reinforcement scheme can be made better.
依据这种技术,可以基本判断缺陷是否适合采用填芯法补强及更好地制定补强的方案。 - After the sliding, follow-up emergency actions to remedy the dam were made using material substitution filling method and loading berm method within short time and the comprehensive reinforcement including permeation grouting in core of the dam were conducted also for a long time.
滑坡发生后,在短期内采用了材料替代填筑方法和反压平台方法进行了紧急修补,并采取了包括对大坝心墙进行防渗灌浆在内的综合除险加固措施,以保证大坝的长期安全。 - Therefore, improving the filling capacity becomes a core problem for the application of die-casting in thin-wall casting.
因此,如何提高薄壁铸件在金属型中的充型能力成为制约金属型薄壁铸造应用的一项瓶颈技术。 - Through development and utilization of multi-layered complex sand bag to solve the problems of underwater filling and placing of sand bags ( as dike core), the operation efficiency was raised, the engineering quality was improved and the cost was cut down.
多层复合砂袋的开发使用,解决了袋装砂堤心水下充灌及铺设工艺,提高了工效及工程质量,节约了成本。 - To innovate the management of filling stations is to establish a series of management system and enterprise culture which are based on objective data and put customers at the core.
加油站创新管理就是要建立一整套开放的、基于客观数据的、为客户创造价值的管理体系和企业文化。 - The compaction standards of the sand-gravel material for filling the dam shell of earth-rockfill dam with clay core are conventionally controlled by the relative density.
粘土心墙土石坝的坝壳砂砾料填筑施工中的压实标准以相对密度控制。 - Filling Standard of Earth Material and Measures of Engineering Treatment for Core Wall of Heihe Dam
黑河大坝心墙土料填筑标准及其工程处理措施 - Waste filling is a late-model environment compatible mining technical measures which achieve to reduce subsidence and emission, also one of core content of green mining technology system.
矸石充填开采是一种集减沉与减排为一体的新型环境相容开采技术措施,也是绿色开采技术体系的核心内容之一。 - The paper presents a kind of semi-dry loose tube optical cable without filling compound in the core.
介绍一种在缆芯中不填充油膏的半干式松管光缆。 - Interval velocity filling method velocity-field-built is very useful for foothill thrust belt, whose core is to acquire interval velocity correctly.
层速度充填法速度建场是山前冲断带的一套建场方法,核心是准确求取层速度。
